TSX-V: VO Last: 0.04 Change: +0.01 | OTCQB: KVLQF Last: 0.02 Change: 0.00
TSX-V: VO     Last: 0.04     Change: +0.01
OTCQB: KVLQF     Last: 0.02     Change: 0.00

Vancouver, B.C. – ValOre Metals Corp. (“ValOre” or the “Company”) (TSX-V: VO; OTCQB: KVLQF; FRANKFURT: KEQ0) today announced that it has entered into a definitive agreement (the “Transaction Agreement“) dated November 23, 2026 with Opportunity Holding Fundo de Investimento em Participações Multiestratégia Resp. Limitada (the “Seller“) to acquire all of the issued and outstanding shares of Bemisa Água Azul Mineração S.A. (“Água Azul S.A.“), a private Brazilian company that holds the Água Azul Gold Project (the “Água Azul Project“) located in the Carajás Mineral Province in Brazil for a total purchase price of US$135 million (the “Transaction“).

The Água Azul Project is an operating gold project with established Mineral Resources, existing mining and processing infrastructure, permits for the current operation and construction of a proposed expansion, and multiple areas for further exploration. The Água Azul Project is an approximately 20,600 hectares (“ha”) property which hosts the Abelhas, Juliano and Campos Altos deposit areas along a 15 kilometre (“km”) structural trend.

Transaction Highlights

  • Mineral Resource Estimate: An independent Mineral Resource Estimate (“MRE”), effective July 28, 2026, comprising 22.78 million tonnes (“Mt”) grading 1.27 grams per tonne (“g/t”) gold (“Au”) containing 931,920 ounces (“oz”) Au in the Indicated category and 26.44 Mt grading 1.29 g/t Au containing 1,099,910 oz Au in the Inferred category. The MRE includes Mineral Resources at the Abelhas, Juliano and Campos Altos deposit areas;
  • Current Operation and Expansion: The Abelhas deposit comprises an operating open-pit gold mine and processing plant currently operating at approximately 120 kilotonnes per annum (“ktpa”), with plans to increase processing capacity to the permitted 200 ktpa level. The Preliminary Economic Assessment (“PEA”) contemplates a subsequent expansion of processing capacity to 2.85 million tonnes per annum (“Mtpa”);
  • Existing Permits and Licenses: The Água Azul Project holds a Mining Concession and an Operating License (“LO”) for a 200 ktpa operation and an Installation License (“LI”), granted in June 2026, for construction of the proposed 2.85 Mtpa expansion. An LO for the expanded operation is required prior to commencement of full-scale production;
  • Preliminary Economic Assessment: The PEA contemplates a 2.85 Mtpa operation with a 10-year Phase 2 mine life and approximately 110,000 oz Au of annual production at full-scale operations, based on 25.96 Mt of PEA mine plan material grading 1.29 g/t Au and containing approximately 1.08 million oz Au. The PEA estimates a post-tax net present value at a 5% discount rate (“NPV5%”) of US$927.6 million, an internal rate of return (“IRR”) of 48%, initial capital of US$297 million and life-of-mine (“LOM”) all-in sustaining costs (“AISC”) of US$1,540/oz, based on a long-term gold price of US$3,609/oz;
  • Exploration Potential: In addition to the Abelhas deposit included in the PEA mine plan, the Água Azul Project contains multiple gold targets along an approximately 15 km structural corridor, including Juliano, Campos Altos and the undrilled Corredor target. Approximately 74,000 metres (“m”) of exploration and resource drilling has been completed on the Água Azul Project, including approximately 59,000 m at Abelhas, with gold mineralization and gold-in-soil anomalies identified along the broader corridor;
  • Transaction Terms: Total consideration of US$135 million, subject to certain customary post-closing adjustments and adjustment for U.S. inflation, comprising US$90 million payable in cash on closing, US$20 million payable on the first anniversary of the closing date and US$25 million payable on the second anniversary of the closing date.
  • Prepayment Option: ValOre shall have the option, exercisable only once and only in respect of the entirety of the Deferred Payments, within four months counted from the closing date, to discharge its obligation to pay the total amount of the Deferred Payments by paying to the Seller US$30 million, subject to adjustment for U.S. inflation.

Nick Smart, CEO and Director of ValOre, commented: “The acquisition of the Água Azul gold property represents a major leap forward for ValOre Metals on our journey to becoming a precious metals producer of scale. Located in the Tier-1 Carajás Mineral Province in Brazil, Água Azul adds a cash-generating, open-pit gold operation, with an installation licence in hand for the expansion of throughput to 2.85 Mtpa, targeting over 100k oz of gold production per year. Furthermore, the property offers exciting exploration potential along a 15 km mineralized corridor holding multiple additional Au targets. We look forward to welcoming the experienced site-based management team at Água Azul and building an exciting future together as we scale up gold production and progress our Pedra Branca PGE project over the coming years.”


Mineral Resource Estimate

The MRE for the Água Azul Project was prepared by Porfirio Cabaleiro Rodriguez, FAIG, FAusIMM, of GE21 Consultoria Mineral Ltda. (“GE21”), an independent Qualified Person (“QP”) as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”). The MRE was prepared in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum (“CIM”) 2014 Definition Standards for Mineral Resources and Mineral Reserves and the CIM 2019 Estimation of Mineral Resources and Mineral Reserves Best Practice Guidelines.

The MRE is based on exploration and drilling conducted by or on behalf of Água Azul S.A. and incorporates 453 drill holes totaling approximately 74,365 m of drilling, including approximately 59,000 m in 362 drill holes at Abelhas, approximately 5,200 m in 35 drill holes at Juliano and approximately 10,100 m in 56 drill holes at Campos Altos. ValOre has not conducted drilling at the Água Azul Project as of the date of this news release.

Mineral Resources are reported on a 100% basis above a cut-off grade of 0.20 g/t Au within conceptual open-pit shells, as summarized in Table 1.

Table 1: Água Azul Mineral Resource Estimate (Effective Date: July 28, 2026) 

Table 1, Água Azul Mineral Resource Estimate by region, weathering and resource class. Total Indicated: 22.78 Mt at 1.27 g/t Au for 931.92 koz Au. Total Inferred: 26.44 Mt at 1.29 g/t Au for 1,099.91 koz Au.

Notes to the Mineral Resource Estimate:
1. Mineral Resources are reported using the 2014 CIM Definition Standards and have an effective date of July 28, 2026. The QP for the estimate is Mr. Porfirio Cabaleiro Rodriguez, FAIG, FAusIMM, a GE21 director.
2. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.
3. Inferred Mineral Resources have a lower level of confidence than Indicated Mineral Resources. Although additional infill drilling and ongoing geological interpretation may increase the level of confidence in certain portions of the Inferred Mineral Resources, there is no guarantee that such work will support their upgrade to the Indicated Mineral Resource category.
4. Mineral Resources are reported on a 100% basis.
5. Mineral Resources considered potentially amenable to open pit mining methods are reported within a conceptual pit shell that uses the following key input parameters: gold price of US$3,288.72/oz; exchange rate of 5.5 BR$/US$; mining cost of US$2.56/t moved; processing costs of US$12.62/t ROM; rehandle costs of US$2.09/t ROM; sustaining process cost of US$1.90/t ROM; mine closure cost of US$0.33/t ROM; site general and administrative costs of US$1.65/t ROM; mine fixed cost (administration) of US$0.24/t ROM; 100% mining recovery; metallurgical recovery of 94.0%, and pit slope angles that range from 47.4 to 51.9°.
6. Mineral Resources considered potentially amenable to open pit mining methods are reported above a 0.20 g/t Au cut-off.
7. The tonnages and grades in the table have been rounded to the estimate relative precision. Values cannot be added due to rounding.
8. Mineral Resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing and other relevant issues. An LO for the expanded operation is required prior to commencement of full-scale production.


Preliminary Economic Assessment

A technical report titled “NI 43-101 Preliminary Economic Assessment, Água Azul Project, Pará, Brazil” (the “PEA”), with an effective date of July 28, 2026, and a report date of November 24, 2026 has been prepared for ValOre by GE21 in accordance with NI 43-101 and has been filed on the Company’s issuer profile on SEDAR+ at www.sedarplus.ca concurrently with this news release. It incorporates the MRE described above and evaluates continued operations and staged expansion at Água Azul.

The PEA was prepared by independent QPs Porfirio Cabaleiro Rodriguez, FAIG, FAusIMM; Leonardo de Moraes Soares, MAIG; Hugo Ribeiro de Andrade Filho, FAusIMM (CP); and Paulo Bergmann Moreira, FAusIMM, each of GE21 and a QP as defined by NI 43-101.

The PEA contemplates open-pit mining at Abelhas and staged expansion of processing capacity to 2.85 Mtpa, using gravity recovery and carbon-in-leach (“CIL”) processing to produce doré, with an assumed gold recovery of 94%. The 13-year mine plan comprises three years of Phase 1 operations followed by ten years of Phase 2, processing 25.96 Mt grading 1.29 g/t Au and producing approximately 1.02 million oz Au, with annual average production of approximately 110,000 oz at full throughput. Filtered tailings would be dry-stacked and co-disposed with waste rock.

Summary of PEA Results

Based on a long-term gold price of US$3,609/oz, the PEA estimates:

  • After-tax NPV5% of US$927.6 million and IRR of 48%;
  • Cash flow and payback: Cumulative undiscounted life-of-mine (“LOM”) after-tax cash flow of US$1,517.8 million and payback of 5.3 years from the start of the modeled schedule;
  • Capital costs: Initial capital of US$297.0 million, including plant expansion, pre-stripping and contingency, plus LOM sustaining capital of US$15.8 million; and
  • Operating costs: Total LOM operating expenditures of approximately US$1.42 billion, averaging US$54.72 per tonne processed, with cash costs of US$1,515/oz and AISC of US$1,540/oz. Cash costs and AISC are non-GAAP financial measures; see “Non-GAAP Financial Measures” below.

The PEA is preliminary in nature and includes Inferred Mineral Resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as Mineral Reserves. There is no certainty that the PEA will be realized. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

For a complete description of the assumptions, qualifications, procedures and parameters relating to the MRE and the PEA, including the economic analysis, mine plan, metallurgical recoveries, capital and operating cost estimates, readers should refer to the full PEA, which is available under the Company’s issuer profile on SEDAR+ at www.sedarplus.ca and on the Company’s website here.


Project Location, Property and Infrastructure

Agua Azul Project Location Map

The Água Azul Project is located in the municipality of Água Azul do Norte, southeastern Pará State, Brazil, within the Carajás Mineral Province. It comprises four contiguous mineral tenure areas covering approximately 20,608 ha, consisting of one Mining Concession covering 6,494 ha and three Exploration Permits covering 14,114 ha, currently held by Água Azul S.A.

The project is approximately 7 km from Água Azul do Norte and is accessible via paved highways and secondary roads. Existing infrastructure includes a processing plant, grid power connection, water supply and tailings management systems, workshops, accommodation and operational support facilities. The PEA contemplates expansion and modernization of this infrastructure to support the proposed processing expansion.

The property encompasses the Abelhas-Juliano exploration area in the central and eastern portions and Campos Altos to the west. Modern exploration began at Abelhas-Juliano in 2012 and at Campos Altos in 2022, with geochemical sampling, geophysical surveys and drilling conducted by or on behalf of Água Azul S.A. Gold production at Abelhas commenced in 2023.


Transaction Structure

ValOre and the Seller entered into an exclusivity letter dated August 20, 2026, as amended on October 5 and November 16, 2026 (the “Exclusivity Letter”), which was superseded by the Transaction Agreement upon its execution. Under the Exclusivity Letter, ValOre caused Banco Santander (Brasil) S.A. (“Santander“) to issue to the Seller an irrevocable and unconditional first-demand bank guarantee in an amount equal to BRL 20,578,800.00 (approximately US$4 million), adjusted by 100% of the Brazilian interbank deposit rate (CDI) from September 30, 2026 until the date of payment (the “Exclusivity Guarantee“). Concurrently with the issuance of the Exclusivity Guarantee, ValOre deposited BRL 20,578,800 (approximately US$4 million) in cash with Santander as collateral for the Exclusivity Guarantee (the “Cash Collateral“). The parties also agreed that the Purchase Price would be adjusted for U.S. inflation from October 4, 2026.

Under the Transaction Agreement, ValOre will acquire all of the issued and outstanding shares of Água Azul S.A., a private Brazilian company which owns 100% of the Água Azul Project and an affiliate entity to be formed to hold certain land interests (“LandCo“) from the Seller on a cash free and debt free basis (assuming nil net debt and a minimum net working capital of BRL 10 million), for total consideration of US$135 million (the “Purchase Price“) subject to certain customary post-closing adjustments, payable as follows:

  1. US$90,000,000, payable in cash on the closing date;
  2. US$20,000,000, payable in cash on the first anniversary of the closing date, and US$25,000,000, payable in cash on the second anniversary of the closing date (the “Deferred Payments“); and
  3. ValOre shall have the option, exercisable only once and only in respect of the entirety of the Deferred Payments, within four (4) months counted from the closing date, to discharge its obligation to pay the total amount of the Deferred Payments by paying to the Seller US$30,000,000 (the “Prepayment Option”).

All amounts payable under the Transaction Agreement, including the Purchase Price and the amount payable under the Prepayment Option, are denominated in U.S. dollars but are payable in Brazilian reais (“BRL”) based on the average PTAX exchange rate for the month preceding the applicable payment date, and are adjusted upward for U.S. consumer price index inflation from October 4, 2026. The U.S. dollar amounts disclosed in this news release are stated before such adjustments.

ValOre is in advanced discussions with a number of financing parties for potential financing arrangements to satisfy its obligations to pay the Purchase Price at closing as required under the Transaction Agreement, working capital obligations following closing and Phase 1 capital and operating expenditures as set out in the PEA, and will provide a comprehensive update on its financing arrangements in due course.

Upon execution of the Transaction Agreement, ValOre also caused Santander to issue to the Seller an irrevocable and unconditional first-demand bank guarantee in an amount equal to BRL 20,578,800.00 (approximately US$4 million), adjusted by 100% of the Brazilian interbank deposit rate (CDI) from September 30, 2026 until the date of payment (the “Signing Guarantee”), which superseded and replaced the Exclusivity Guarantee with the Cash Collateral remaining with Santander. The Seller will be entitled to enforce the Signing Guarantee, and Santander will be entitled to retain the Cash Collateral, in the event that (a) the Transaction Agreement is terminated as a result of ValOre not obtaining the acceptance of the TSX Venture Exchange (the “TSXV”) for the Transaction (subject only to the satisfaction of customary conditions imposed by the TSXV in connection with such acceptance) on or before December 23, 2026; (b) the Seller terminates the Transaction Agreement as a result of a breach by ValOre of its fundamental representations as set out in the Transaction Agreement or (c) ValOre fails to complete closing once all conditions precedent to the Transaction have been satisfied or waived. In the event that (a) the Seller fails to complete closing once all conditions precedent to the Transaction have been satisfied or waived, or (b) the Seller fails, for reasons exclusively attributable to it, to take the necessary measures to implement corporate reorganization of Água Azul S.A. on or before January 15, 2027, then the Seller will pay to ValOre a fee in the same amount.

Additionally, ValOre’s subsidiary, Pedra Branca do Brasil Mineração Ltda., is an unconditional joint and several guarantor of all of ValOre’s payment and performance obligations under the Transaction Agreement.

The Transaction Agreement contains customary representations and warranties, covenants relating to the conduct of Água Azul S.A.’s business during the interim period, non-solicitation obligations binding on the Seller for a period of three years following closing, conditions precedent to closing (including, among others, the absence of a material adverse change, the implementation of a corporate reorganization of Água Azul S.A., and the acceptance of the Transaction by the TSXV), indemnification provisions (subject to customary limitations), an outside date of December 23, 2026 for receipt of the acceptance of the Transaction by the TSXV (subject only to the satisfaction of customary conditions imposed by the TSXV in connection with such acceptance) and January 15, 2027 for the satisfaction of all other conditions precedent, and certain customary post-closing obligations. ValOre has agreed to use its best efforts to obtain the acceptance of the TSXV for the Transaction (subject only to the satisfaction of customary conditions imposed by the TSXV in connection with such acceptance) on or before December 23, 2026.

The Seller has agreed to implement prior to the closing of the Transaction a corporate reorganization whereby certain rural land held by Água Azul S.A. will be spun off into LandCo, and a surface rights agreement will be entered into at closing to ensure that Água Azul S.A. retains mining access over such spun-off properties.

Upon closing of the Transaction, ValOre will assume the following material post-closing obligations under the Transaction Agreement: 

  • Two of the rural properties to be spun off into LandCo, Fazenda Abelhas (possessory interest) and Fazenda Cascalheira (possessory interest), are held through possessory rights (direitos possessórios) evidenced by public deeds of assignment of possession, rather than through registered title. Following closing, ValOre will be responsible for conducting and completing the land regularization procedures relating to these properties in the name of LandCo, and the Seller will be required to provide reasonable assistance for a period of two years following closing. The Seller has agreed to indemnify ValOre for losses arising from or in connection with these regularization matters, without being subject to the general limitations on indemnification under the Transaction Agreement.
  • Água Azul S.A. is a co-executing party to a financing agreement between the Brazilian Agency for the Financing of Studies and Projects (“FINEP”) and Bemisa Participações S.A. (as successor to Bemisa Holding S.A.) (the “FINEP Financing Agreement”), under which a certain financed innovation plan has been fully performed and approved by FINEP. Following closing, Água Azul S.A.’s obligations under the FINEP Financing Agreement will be limited to certain obligations attributable to it in its capacity as co-executing party that arise after closing, as set out in the Transaction Agreement, which consist mainly of information and reporting obligations. All payment obligations and other liabilities under the FINEP Financing Agreement, including those of the borrower and any relating to periods prior to closing, will remain the responsibility of the Seller, which has agreed to indemnify ValOre for losses arising in connection with the FINEP Financing Agreement (other than losses resulting from a failure by Água Azul S.A. to comply with its post-closing obligations), without being subject to the general limitations on indemnification. No consent from FINEP is required for the Transaction, other than a post-closing notification.

As security for the Deferred Payments, ValOre has agreed to grant to the Seller at closing fiduciary assignments (alienação fiduciária) governed by Brazilian law over 51% of Água Azul S.A.’s total and voting share capital and 49% of LandCo’s total and voting share capital (the “Fiduciary Assignments“). Under the Fiduciary Assignments, ValOre will transfer to the Seller resolvable title (propriedade fiduciária resolúvel) to the encumbered shares, which will be released upon payment in full of the Deferred Payments (including through the exercise of the Prepayment Option). For as long as no enforcement event has occurred, ValOre will retain the right to exercise all rights attached to the encumbered shares, including voting rights. The Fiduciary Assignments also operate as binding voting agreements under Brazilian corporate law, pursuant to which ValOre has agreed not to approve certain matters in respect of Água Azul S.A. and LandCo without the Seller’s prior consent, including, among others: (i) incurring indebtedness for borrowed money that would increase aggregate indebtedness to BRL 1 million or more (BRL 100,000 in the case of LandCo); (ii) acquiring or disposing of assets above certain thresholds and, in any case, disposing of any mining rights or rural properties; and (iii) paying dividends or other distributions, unless certain minimum cash balances are maintained. If ValOre fails to pay any Deferred Payment and such failure is not cured within five business days following written notice from the Seller, the full outstanding balance of the Purchase Price will become immediately due and payable, and the Seller will be entitled to enforce the Fiduciary Assignments, including through the judicial or extrajudicial sale of the encumbered shares. The Fiduciary Assignments may also be enforced upon certain other material breaches by ValOre that remain uncured for five business days following written notice. In ValOre’s discretion, it may substitute the Fiduciary Assignments with an irrevocable and unconditional bank guarantee issued by any of Santander, Itaú Unibanco, Banco Bradesco or BTG Pactual.

The Seller is at arm’s length to ValOre and its affiliates and associates, and no finder’s fee is payable by ValOre in connection with the Transaction. No changes to the board of directors or management of ValOre or any of its subsidiaries are anticipated in connection with the Transaction.

The Transaction constitutes a “Fundamental Acquisition” pursuant to TSXV Policy 5.3.

A copy of the Transaction Agreement will be available on the Company’s issuer profile on SEDAR+ at www.sedarplus.ca.

Bridge Loans

In connection with the Transaction, ValOre obtained the following loans to fund, and subsequently refinance in part, the Cash Collateral provided in support of the Exclusivity Guarantee and the Signing Guarantee:

A US$5 million unsecured and non-convertible bridge loan facility (the “Bridge Loan“) from Taurus Funds Management Pty Limited, on behalf of Taurus Mining Royalty Fund L.P. (“Taurus“), pursuant to an unsecured promissory note (the “Note“) issued by ValOre to Taurus. The Bridge Loan bears interest at a rate of 10% per annum and matures on August 6, 2027 with a minimum interest payment equal to six months interest on the entire principal amount of the Note being payable by ValOre to Taurus. ValOre has also paid an upfront fee to Taurus of US$250,000 and agreed to pay all Taurus costs and expenses (including all of Taurus’s reasonable legal expenses) in connection with the Bridge Loan. The proceeds of the Bridge Loan were used to provide the Cash Collateral in support of the Exclusivity Guarantee and subsequently, the Signing Guarantee. The principal amount outstanding under the Note is currently US$3 million.

A loan (the “Scott Loan“) in the principal amount of US$2,000,000 from Maria Scott (“Scott“), an associate of Rob Scott, the Chief Financial Officer of ValOre, and accordingly a Non-Arm’s Length Party (as such term is defined in the policies of the TSXV) to the Company, pursuant to a binding term sheet entered into between ValOre and Scott. Scott is not a “related party” of the Company for the purposes of Multilateral Instrument 61-101 – Protection of Minority Security Holders in Special Transactions. The Scott Loan bears interest at a rate of 10% per annum during the first 60 days and 15% per annum during the subsequent 60 days, and will mature on February 6, 2027. In connection with the Scott Loan, the Company agreed to pay Scott a front end fee of US$100,000. The proceeds of the Scott Loan were used exclusively for the partial repayment of the Bridge Loan previously advanced to the Company by Taurus pursuant to the Note.

Trading Halt

As the Transaction constitutes a “Fundamental Acquisition” under the policies of the TSXV, trading in the Company’s common shares has been halted and is expected to remain halted pending completion of the Transaction.

Approvals

The Transaction, the Bridge Loan and Scott Loan have been unanimously approved by the Board of Directors of ValOre (the “Board”) and, after considering the advice of its financial and legal advisors, the Board has unanimously determined that the Transaction is in the best interest of ValOre. The Transaction does not require shareholder approval.

The closing of the Transaction and related matters remain subject to the review and acceptance by the TSXV.

Transaction Timeline

The Company anticipates that the closing of the Transaction will occur on or before January 15, 2027.


Advisors and Counsel

Bennett Jones LLP is acting as Canadian legal counsel to the Company and TozziniFreire Advogados is acting as Brazilian legal counsel to the Company.

Banco Santander (Brasil) S.A. is acting as financial advisor to the Seller and BMA Advogados and VHC Advogados are acting as Brazilian legal counsel to the Seller.

Qualified Person Statement

All scientific and technical information disclosed in this news release has been reviewed and approved by Porfirio Cabaleiro Rodriguez, B.Sc. Min. Eng., FAIG, FAusIMM; Hugo Ribeiro de Andrade Filho, B.Sc. Min. Eng., FAusIMM (CP); Leonardo de Moraes Soares, B.Sc. Geo., MAIG; and Paulo Bergmann Moreira, B.Sc. Min. Eng., FAusIMM, of GE21 Consultoria Mineral Ltda. (“GE21”), each within their respective areas of responsibility. All four are Qualified Persons (“QPs”) as defined under NI 43-101, are independent of ValOre within the meaning of Section 1.5 of NI 43-101, and are responsible for the preparation of the Technical Report supporting the MRE and PEA disclosed herein.

Drill-hole collars at the Água Azul Project were surveyed using high-precision GNSS/RTK equipment, and downhole surveys were used to record changes in azimuth and inclination. Diamond drill core was logged and photographed, and mineralized core was generally sampled over 0.3 m to 1.0 m intervals, with half-core retained and half submitted for analysis under documented chain-of-custody procedures. Samples were prepared by SGS Geosol in Parauapebas, Pará, and analyzed in Vespasiano, Minas Gerais, with gold determined by fire assay with an atomic absorption finish. ALS Chemex was used as an independent check laboratory. QA/QC procedures included the insertion of blanks, duplicates and certified reference materials. The QPs verified the underlying data through site inspections by Messrs. Soares and Moreira and independent desktop reviews, including reviews of drilling and analytical databases, QA/QC results, geological and Mineral Resource models, metallurgical testwork, engineering studies and economic assumptions. Variability in duplicate sample results and isolated exceedances in certified reference material analyses were identified but, in the QPs’ opinion, do not materially compromise the reliability of the analytical database for the purposes of the current MRE. The QPs consider the data and verification work completed adequate for the purposes of the MRE and PEA. Further details regarding data verification and its limitations are provided in Sections 3 and 12 of the Technical Report.


About ValOre Metals Corp.

ValOre Metals Corp. (TSX-V: VO, OTCQB: KVLQF; FRANKFURT: KEQ0) is a Canadian company with a team aiming to deploy capital and knowledge on projects which benefit from substantial prior investment by previous owners, existence of high-value mineralization on a large scale, and the possibility of adding tangible value through exploration and innovation. ValOre currently owns the Pedra Branca Platinum Group Elements Project comprising 45 exploration licenses covering a total area of 51,096 hectares (126,260 acres) in northeastern Brazil, and has entered into a definitive purchase agreement to acquire the Água Azul Project, an exploration, development and production project located in the Carajás Mineral Province, Pará State, in northern Brazil.

On behalf of the Board of Directors,

“Nick Smart”

Nicholas Smart, Chief Executive Officer and Director, ValOre Metals Corp.

For further information about ValOre Metals Corp. please visit our website at www.valoremetals.com or contact Investor Relations at 778-819-4484, or by email at [email protected].

ValOre Metals Corp. is a proud member of Discovery Group. For more information please visit: www.discoverygroup.ca

Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this release.

Non-GAAP Financial Measures

This news release refers to cash costs per ounce and AISC per ounce of gold, which are non-GAAP financial measures that do not have a standardized meaning under IFRS Accounting Standards and may not be comparable to similar measures presented by other issuers. As the proposed expansion of the Água Azul Project is at the PEA stage, these measures are forward-looking estimates derived from the PEA mine plan and cost model, not from historical operating results. Cash costs include estimated mining, processing and site general and administrative costs, royalties and selling costs. AISC includes cash costs plus sustaining capital expenditures and closure costs. Both measures are divided by total payable gold ounces over the LOM and exclude acquisition costs, expansion capital and corporate general and administrative expenses. The Company believes these measures provide investors with a useful indication of the expected cost of producing gold at the Água Azul Project. They should not be considered in isolation or as a substitute for measures prepared in accordance with IFRS Accounting Standards.

Forward-Looking Information

This news release contains “forward-looking information” and “forward-looking statements” (collectively, “forward-looking statements”) within the meaning of applicable securities laws. All statements, other than statements of historical fact, included in this news release are forward-looking statements, including, without limitation, statements regarding: the completion of the Transaction and the anticipated timing thereof, including the anticipated closing of the Transaction on or before January 15, 2027; the satisfaction of the conditions precedent to closing, including the implementation of the corporate reorganization of Água Azul S.A. and the spin-off of certain rural land into LandCo, and the entering into of the surface rights agreement at closing; the anticipated sources of funding for the Purchase Price including debt, royalty and equity financings and the status of those discussions, and the anticipated update on the Company’s financing arrangements; the post-closing adjustments to the Purchase Price and the adjustment of amounts payable for exchange rates and U.S. inflation; the payment of the Deferred Payments and any exercise of the Prepayment Option; the grant of the Fiduciary Assignments at closing, the restrictions thereunder and any substitution thereof with a bank guarantee; the circumstances in which the Signing Guarantee may be enforced or the Cash Collateral retained, or in which a fee may be payable by the Seller to ValOre; the Company’s post-closing obligations under the Transaction Agreement, including the land regularization procedures relating to the LandCo properties, Água Azul S.A.’s obligations under the FINEP Financing Agreement and the Seller’s indemnification obligations in respect thereof; the anticipated absence of changes to the board of directors or management of ValOre in connection with the Transaction; the Company’s exploration and development plans for the Água Azul Project and the results thereof, including the exploration potential and exploration targets described herein; the results of the PEA, including estimated NPV, IRR, cash flow, payback, capital and operating costs, cash costs, AISC, production, mine life, mine plan, processing and tailings methods and metallurgical recoveries; the planned increase in processing capacity to 200 ktpa and the proposed expansion to 2.85 Mtpa, including the expansion and modernization of existing infrastructure and the receipt of an LO for the expanded operation; the Company becoming a precious metals producer of scale and the anticipated scale-up of gold production; the advancement of the Pedra Branca PGE project; the anticipated duration of the trading halt; and the receipt of all necessary corporate and regulatory approvals for completion of the Transaction, including the acceptance by the TSXV.

Forward-looking statements are often, but not always, identified by the use of words such as “intends”, “expects”, “anticipates”, “plans”, “estimates”, “targets”, “contemplates”, “proposed”, “potential”, “believes”, “will”, “would”, “subject to”, “may”, and similar expressions. Although ValOre believes that the expectations reflected in its forward-looking statements are reasonable, such statements have been based on factors and assumptions concerning future events that may prove to be inaccurate.

These factors and assumptions are based upon currently available information to ValOre including, but not limited to: that the Company will complete the Transaction on the terms and within the timeframe anticipated by management; that the conditions precedent to closing, including the corporate reorganization of Água Azul S.A., will be satisfied or waived; that the Company will obtain royalty, debt and equity financing on acceptable terms; that the Company will receive all necessary corporate and regulatory approvals for completion of the Transaction, including the acceptance by the TSXV; that the land regularization procedures relating to the LandCo properties will be implemented and that the Seller will satisfy its indemnification obligations; that current operations at the Água Azul Project will continue without material disruption; and the assumptions underlying the MRE and the PEA, including a gold price of US$3,288.72/oz for the MRE and a long-term gold price of US$3,609/oz for the PEA, an exchange rate of 5.5 BR$/US$, metallurgical recovery of 94%, and the capital and operating cost estimates, mine plan and production schedule set out in the PEA. Such statements are subject to known and unknown risks, uncertainties and other factors that could influence actual results or events and cause actual results or events to differ materially from those stated, anticipated or implied in the forward-looking statements. A number of important factors including those set forth in other public filings of the Company could cause actual outcomes and results to differ materially from those expressed in these forward-looking statements. Factors that could cause the actual results to differ materially from those in forward-looking statements include, but are not limited to: the failure to complete the Transaction in the timeframe and on the terms anticipated by management; the failure to satisfy the conditions precedent to closing, including the implementation of the corporate reorganization of Água Azul S.A. and the absence of a material adverse change; the Company not receiving all necessary corporate and regulatory approvals for completion of the Transaction including the acceptance by the TSXV; the failure to obtain sufficient royalty, debt and equity financings, and dilution to shareholders resulting from any equity financing; failure to obtain the acceptance of the TSXV for the Transaction on or before December 23, 2026, and the resulting enforcement of the Signing Guarantee and loss of the Cash Collateral; fluctuations in the BRL/US$ exchange rate and U.S. inflation, which may increase the amounts payable under the Transaction Agreement; the accuracy of the Mineral Resource Estimate, which is based on assumptions regarding metal prices, cut-off grades, recoveries and other parameters that may prove incorrect; the fact that Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability; the preliminary nature of the PEA, which includes Inferred Mineral Resources that are considered too speculative geologically to have economic considerations applied to them; the accuracy of capital and operating cost estimates; the ability to obtain an LO for the expanded operation; the Company’s ability to make the Deferred Payments and the risk of enforcement of the Fiduciary Assignments, as well as the restrictions on the operation of Água Azul S.A. and LandCo thereunder; risks relating to the possessory rights over certain LandCo properties and the completion of the related land regularization procedures; risks relating to Água Azul S.A.’s obligations under the FINEP Financing Agreement and the Seller’s ability to satisfy its indemnification obligations; the Company’s ability to repay the Bridge Loan and the Scott Loan; the risk that the terms of any debt or royalty financing may not be agreed or may be on terms different than those anticipated by management; the potential for an extended trading halt; fluctuations in gold prices; market conditions and access to capital; and other risks associated with the mining industry, including permitting, environmental, title, regulatory and political risks; and the other risks and uncertainties described in the Company’s public filings. Readers are cautioned to not place undue reliance on forward-looking statements. The statements in this news release are made as of the date of this release and, except as required by applicable law, ValOre does not undertake any obligation to publicly update or to revise any of the included forward-looking statements, whether as a result of new information, future events or otherwise. ValOre undertakes no obligation to comment on analyses, expectations or statements made by third parties in respect of ValOre, or its financial or operating results or (as applicable), their securities.

Filmed at the 2026 Precious Metals Summit in Beaver Creek, ValOre CEO Nick Smart traces 21 years of building major projects for Anglo American and De Beers across four continents, and explains why this is a critical year for Pedra Branca.

Produced by ValOre Metals Corp. Filmed on location at the Precious Metals Summit, Beaver Creek, Colorado, September 2026.

Talk to Nick directly

Questions about Pedra Branca or the road to the PEA? Nick and the ValOre team welcome the conversation.


*2022 NI 43-101 Inferred Mineral Resource Estimate: 2,198 koz palladium + platinum + gold (“2PGE+Au”) contained in 63.6 Mt grading 1.08 g/t 2PGE+Au. Effective date: March 8, 2022. See the NI 43-101 Technical Report titled “Independent Technical Report – Mineral Resource Update on the Pedra Branca PGE Project, Ceará State, Brazil,” dated May 8, 2022.

This page contains forward-looking statements, including statements regarding the timing and content of the Preliminary Economic Assessment, an updated mineral resource, metallurgical testwork and corporate development activity. Actual results may differ materially. Readers are referred to the full cautionary language in ValOre’s continuous disclosure filings on SEDAR+.

ValOre Chairman Jim Paterson, one of the two principals of Discovery Group, sat down with Crux Investor at the Precious Metals Summit in Beaver Creek. Drawing on nearly 30 years in the business, he talks about what the return of capital means for well-run companies, why funded multi-year plans create value per share, why management should own shares they paid for, and how Discovery Group vets deals and the people behind them.

 

Interview produced by Crux Investor. Join the conversation at youtube.com/@CRUXInvestor.


This page contains “forward-looking statements” within the meaning of applicable securities laws. Although ValOre believes that the expectations reflected in its forward-looking statements are reasonable, such statements have been based on factors and assumptions concerning future events that may prove to be inaccurate. These factors and assumptions are based upon currently available information to ValOre. Such statements are subject to known and unknown risks, uncertainties and other factors that could influence actual results or events and cause actual results or events to differ materially from those stated, anticipated or implied in the forward-looking statements. A number of important factors including those set forth in other public filings could cause actual outcomes and results to differ materially from those expressed in these forward-looking statements. Factors that could cause the actual results to differ materially from those in forward-looking statements include the future operations of ValOre and economic factors. Readers are cautioned to not place undue reliance on forward-looking statements. The statements in this press release are made as of the date of this release and, except as required by applicable law, ValOre does not undertake any obligation to publicly update or to revise any of the included forward-looking statements, whether as a result of new information, future events or otherwise. ValOre undertakes no obligation to comment on analyses, expectations or statements made by third parties in respect of ValOre, or its financial or operating results or (as applicable), their securities.

Jim Paterson and Nick Smart sat down with CEO.CA to talk about how Discovery Group builds companies, why a 2.2-million-ounce platinum and palladium resource in Brazil is a rare thing to own, and what stands between ValOre and a Preliminary Economic Assessment targeted for late 2026.

Two people built this conversation from opposite ends of the same problem. Jim Paterson has spent a career assembling teams around assets and watching majors buy the result. Nick Smart has spent his taking projects from concept into production for Anglo American and De Beers. CEO.CA asked each of them to explain what the other brings, and the answers arrive at the same place.

Interview produced by CEO.CA. Join the discussion at ceo.ca/vo.

The short version

  • Discovery Group’s model starts with people, and with matching the right team to the specific project and region rather than stretching into unfamiliar ground.
  • Pedra Branca hosts a 2022 NI 43-101 Inferred Mineral Resource of 2,198,000 oz 2PGE+Au across seven near-surface deposit areas, on 51,096 hectares in Ceará State.*
  • ValOre has doubled the resource since acquiring the project in 2019, building on roughly 30,000 metres of historical drilling by Anglo American and earlier operators.
  • A 2026 sampling campaign is feeding metallurgical testwork at the University of Cape Town, one of the core inputs to the PEA.
  • The PEA is targeted for late 2026 and will fold mine planning, engineering, infrastructure and updated economic assumptions into a single economic picture.
  • Platinum and palladium supply is concentrated in a handful of jurisdictions, which is central to how the board frames ValOre’s position.

*The 2022 Technical Report is entitled “Independent Technical Report –Mineral Resource Update on the Pedra Branca PGE Project, Ceará State, Brazil” was prepared as a National Instrument 43-101 Technical Report on behalf of ValOre Metals Corp. with an effective date of March 08, 2022. The 2022 Technical Report by Independent qualified persons, Fábio Valério (P.Geo.) and Porfirio Cabaleiro (P.Eng.), of GE21, commissioned to complete the mineral resource estimate while Chris Kaye of Mine and Quarry Engineering Services Inc. (MQes), was commissioned to review the metallurgical information. The Mineral Resource estimates were prepared in accordance with the CIM Standards, and the CIM Guidelines, using geostatistical, plus economic and mining parameters appropriate to the deposit. Mineral Resources, which are not mineral reserves, do not have demonstrated economic viability, and may be materially affected by environmental, permitting, legal, marketing, and other relevant issues. Mineral Resources are based upon a cut-off grade of 0.4 g/t PGE+Au, correlated to Pd_eq grade of 0.35 g/t, and were limited by an economic pit built in Geovia Whittle 4.3 software and following the geometric and economic parameters as disclosed in the 2022 NI 43-101 Technical Report.

This page contains “forward-looking statements” within the meaning of applicable securities laws. Although ValOre believes that the expectations reflected in its forward-looking statements are reasonable, such statements have been based on factors and assumptions concerning future events that may prove to be inaccurate. These factors and assumptions are based upon currently available information to ValOre. Such statements are subject to known and unknown risks, uncertainties and other factors that could influence actual results or events and cause actual results or events to differ materially from those stated, anticipated or implied in the forward-looking statements. A number of important factors including those set forth in other public filings could cause actual outcomes and results to differ materially from those expressed in these forward-looking statements. Factors that could cause the actual results to differ materially from those in forward-looking statements include the future operations of ValOre and economic factors. Readers are cautioned to not place undue reliance on forward-looking statements. The statements in this press release are made as of the date of this release and, except as required by applicable law, ValOre does not undertake any obligation to publicly update or to revise any of the included forward-looking statements, whether as a result of new information, future events or otherwise. ValOre undertakes no obligation to comment on analyses, expectations or statements made by third parties in respect of ValOre, or its financial or operating results or (as applicable), their securities.

When one of our active investors flagged Norilsk Nickel’s Q1 2026 production report to me last week, it crystallized something I’ve been watching with increasing concern: the world’s platinum group element (PGE) supply chain is becoming more fragile by the quarter, and the implications are no longer theoretical.

The Norilsk numbers are stark. Year-over-year, the Russian mining giant reported platinum output down 26%, palladium down 18%, copper down 10%, and nickel essentially flat. Their full-year 2026 guidance now points to declines of 10–11% in palladium, 5–8% in platinum, 3% in nickel, and 5% in copper. For context, Norilsk produces roughly 40% of the world’s primary palladium supply — about 2.4 million ounces of a global total near 6.2 million ounces.

That alone would be a market-moving development. But Norilsk isn’t operating in isolation. In Zimbabwe, the world’s third-largest PGE producer after South Africa and Russia, the picture is similarly difficult. Zimplats, Zimbabwe’s largest PGE producer, reported 6E ounce production down 56% in Q1 2026 versus the prior year, driven by an extended smelter shutdown. And in late April, the Zimbabwean government announced an indefinite ban on unrefined critical mineral exports, layering regulatory uncertainty over the operational disruptions already in play.

Three jurisdictions, South Africa, Russia, and Zimbabwe, collectively account for approximately 90% of the world’s primary PGE supply. When two of those three are simultaneously shedding ounces, the arithmetic is sobering.

The near-term picture: a deepening deficit

The platinum and palladium markets entered 2026 already stretched. The World Platinum Investment Council and Metals Focus have both documented multi-year structural deficits in platinum and palladium, with mine supply heading toward a 12-year low. Platinum prices climbed roughly 120% in 2025, and palladium followed with gains of nearly 80%; both moves driven in significant part by the supply side rather than headline demand. The Q1 2026 production data we’re now seeing from Norilsk and Zimplats suggests that the near-term supply/demand deficit isn’t narrowing – it’s deepening. I expect continued price pressure in the months ahead, and the recent forecasts of a softening palladium market through 2026 may need to be revisited.

90% of primary PGE supply comes from three countries

The bigger picture: concentration risk is real risk

Beyond the immediate price action, the more important story is structural. When more than 90% of the primary supply of a critical metal cluster comes from three countries, the global economy is exposed to a fundamental concentration risk. The world’s automotive industry depends on PGEs for catalytic converters. Medical device manufacturers rely on platinum for pacemakers, oncology treatments, and surgical implants. The chemical and electronics industries use these metals across an enormous range of catalysts and components. The hydrogen economy, fuel cells, electrolyzers, and the broader clean-energy transition, runs on platinum and the related PGE metals.

In other words: this is not a niche commodity story. PGE supply security is industrial security. And yet, despite years of acknowledgement that critical mineral supply chains need diversification, the concentration of primary PGE supply hasn’t meaningfully changed.

The case for new supply from Tier 1 jurisdictions

If we accept that PGE supply concentration is a long-term vulnerability, and the data make that hard to dispute, then the question becomes: what does the world do about it? The answer is the same as for every other critical mineral: accelerate the development of new primary supply from stable, mining-friendly jurisdictions.

This is precisely the conviction behind ValOre’s work in Brazil. Brazil is a Tier 1 mining jurisdiction with strong rule of law, an established regulatory framework, and a long track record of successful operations across multiple commodities. Our 100%-owned Pedra Branca PGE Project in Ceará State hosts an NI 43-101 inferred resource of 2,198,000 ounces (“oz”) palladium + platinum + gold (“2PGE+Au”) in 63,568,000 tonnes (“t”) grading 1.08 g/t 2PGE+Au across seven distinct deposit areas, with mineralization that outcrops at surface — supporting open-pit development scenarios. Earlier this year, our metallurgical testwork demonstrated PGE extractions above 70% from weathered material using bioleaching, a processing pathway with the potential for a meaningfully lower environmental footprint than conventional smelting routes. We are now advancing toward a Preliminary Economic Assessment, targeted for completion at the end of 2026.

I’m not suggesting any single project solves the problem. The world will need many new sources of primary PGE supply, in many jurisdictions, brought online over the coming decade. But Q1 2026 is a useful reminder that the existing supply base is not as resilient as the headline numbers suggest, and that the time horizon for adding alternatives is shorter than it looks.

We continue to watch the geopolitical and operational developments at Norilsk, Zimplats, and across the South African platinum belt closely. We also continue to believe that the long-term thesis for PGEs, and for the developers building the next generation of supply, remains compelling.

— Nick

Nick Smart, CEO · ValOre Metals Corp.
[email protected]
linkedin.com/in/nick-smart/

 

Cautionary Note & Forward-Looking Statements 

This commentary contains forward-looking statements within the meaning of applicable Canadian securities laws, including statements regarding PGE market dynamics, future commodity prices, the timing of ValOre’s planned Preliminary Economic Assessment, and the potential of the Pedra Branca Project. Forward-looking statements are based on assumptions and are subject to known and unknown risks and uncertainties that may cause actual results to differ materially. The mineral resource referenced is an inferred resource as disclosed in the NI 43-101 Technical Report dated effective March 8, 2022. Inferred mineral resources are not mineral reserves and do not have demonstrated economic viability. Bioleaching test results referenced are preliminary metallurgical results and do not guarantee future commercial recoveries.

Sources referenced: Norilsk Nickel Q1 2026 production report (The Moscow Times, 28 April 2026); Zimbabwe critical minerals export ban (InvestorNews); Zimplats Q1 2026 6E output (Mining Zimbabwe); World Platinum Investment Council and Metals Focus 2026 outlooks.

ValOre Metals Corp. (TSX-V: VO; OTCQB: KVLQF; Frankfurt: KEQ0)

 

Click here to read the article on Crux Investor:

https://www.cruxinvestor.com/posts/valore-metals-aiming-to-fill-massive-supply-gap-for-platinum-palladium

The Investment Case for Platinum & Palladium Investment in 2026 (Jan 13, 2026)

Vancouver, British Columbia, December 30, 2025 – ValOre Metals Corp. (“ValOre” or  “the Company”; TSX-V: VO, OTCQB: KVLQF, Frankfurt: KEQ0); today provided a message from the CEO to the shareholders highlighting key milestones achieved in 2025 and outlining the Company’s growth strategy for the year ahead.

Dear Shareholders and ValOre Community,

As we turn the page on 2025 and look ahead to a new year, I want to take a moment to reflect on the past few months and lay out why I am so energised about the year ahead.

2025 has been a year of growth and transition for ValOre Metals. We continued to develop our flagship Pedra Branca PGE project in Brazil, completed a Trado® auger drilling program completed at the Esbarro deposit, received approval of Final Exploration Reports for key mineral claims, marking a major regulatory advancement and commenced a metallurgical testwork program with the University of Cape Town in South Africa. It also marked the beginning of an exciting new chapter for me, as I stepped into the role of Chief Executive Officer from October 2025. Click here for a video overview from our site visit in November 2025.

The year ahead promises even more opportunity, as we recently signed up the well-regarded engineering company Lycopodium as lead process engineering consultant in support of our Pedra Branca project. The addition of Lycopodium’s experienced team and project knowledge significantly strengthens our development pathway as we build on and expand our metallurgical testwork, underway with the University of Cape Town and progress towards licencing applications and a Preliminary Economic Assessment, to be published later in the year.

Equally importantly, we are progressing ValOre’s broader strategy to capture new opportunities in the critical and precious metals space, with a focus on some of the most prospective regions of Brazil. We have an ambitious goal – to transition from a pure exploration focus and become an integrated precious-metals producer. Market conditions are competitive, but also full of possibility for disciplined companies with high-quality assets, experienced teams and an agile approach. That is exactly how I see ValOre: a lean, active explorer & developer ready to create meaningful shareholder value.

Precious Metals Markets:

2025 has been a pivotal year for precious metals. Gold continued its well-documented, multi-year run and set new record highs, exceeding $4,400 /oz – driven by geopolitical tensions, US dollar weakness and interest rate cut expectations. Attracting fewer headlines, however, has been an even more dramatic reversal of fortunes for another group of precious metals, the Platinum Group Metals.

After years of depressed conditions, with prices of Platinum and Palladium hovering at or below $1,000/oz, both metals have staged a stunning breakout, with prices nearly doubling over the last 6 months of the year. The main drivers for this are outlined below.

2025 Precious Metals Pricing - Source: https://tradingeconomics.com

Figure 1: 2025 Precious Metals Pricing – Source: https://tradingeconomics.com

Platinum Group Element (PGE) Demand Drivers:

  1. Automotive demand:

Automotive catalysts continue to be a dominant driver of PGE demand, accounting for ~40% of total Platinum demand and ~80% of all Palladium and Rhodium demand1. PGE-loaded catalytic converters are used to control emissions in internal combustion engine (ICE) vehicles, and in hybrid (HEV) and plug-in hybrid vehicles (PHEV). Hybrid vehicles use 10 – 20% more PGEs2 per vehicle than ICE vehicles, as the engines cycle on and off, running cooler and requiring a higher loading of precious metals for a given conversion efficiency.

Globally in 2025, approximately 55% of new vehicle sales were ICE vehicles, with 20% hybrids (HEV+PHEV) and 25% battery electric vehicles (BEV)3. In the US, where Federal EV incentives have been eliminated since the end of September, the percentage of new ICE vehicles sold was higher, at ~75%. While in China, over half of new vehicles sold are now electric.

Several major automakers including Ford4, Honda5, Volkswagen and Porsche6, have announced they are scaling-back, or pivoting EV programme plans to increasingly focus on more profitable ICE and hybrid models, as they face changing consumer adoption trends and economic and infrastructure limitations.

This trend is likely to drive sustained demand for Platinum group metals for the foreseeable future.

  1. Jewelry demand

Record-high gold prices may create windfalls for investors, but headaches for jewelers and jewelry-buyers, who experience issues with affordability and inventory overhead as their raw input costs soar. Due to its precious nature, rarity and resilience, Platinum is viewed as an increasingly attractive alternative to white gold for many types of jewelry. Platinum demand for jewelry is forecast to rise from between 5 – 9% for 20257, with China being a particularly strong area of growth.

Globally, jewelry production accounts for nearly 2,000 metric tonnes (70M oz) of gold and up to 60 metric tonnes (~2M oz) of Platinum annually8, and is the second largest demand driver for Platinum after auto catalysts. Due to the far larger scale of gold use in jewelry relative to Platinum, switching just 1% of the total current gold jewelry demand to Platinum would be enough to double the annual supply deficit for platinum of ~700k oz. This factor is expected to continue to grow Platinum demand.

  1. Investment demand

The third major category that has been driving recent PGE price movements is investment demand. As a precious metal, like gold, platinum has benefited from increased investor interest due to US Federal Reserve rate cuts and inflationary pressures. In China, the launch of physically settled platinum futures on the Guangzhou Futures Exchange has boosted confidence, and demand for physical platinum bar and coin in China has grown from nearly zero in 2019 to over 400k oz in 20259.

Platinum Group Element (PGE) Supply:

On the supply side, the market has recorded three consecutive annual deficits, with the 2025 shortfall estimated at 692,000 ounces. This has cut above-ground stocks by 42%, leaving less than five months of coverage10.

Finding and bringing into production new sources of PGE supply is exceedingly difficult, with only one major greenfield mine, Ivanhoe’s Platreef mine, in South Africa, entering production in recent years. This is due to a number of unique challenges that make economic PGE deposits so rare:

The first is the geological rarity of concentrated ore grades. Although the presence of platinum as an element in the Earth’s crust is not excessively rare (on average being similar to gold at few parts per billion) – finding a concentration of the metal in the parts per million range needed for an economic deposit, is far more difficult. These tend to be tied to ancient mafic–ultramafic intrusions with a very specific set of magmatic and geochemical conditions needed to efficiently mobilise and concentrate PGEs. This goes some way to explaining why 90% of the World’s platinum reserves are found in a single country, South Africa, and why over 100 M oz of gold are mined every year, while only 5 – 6 M oz of primary Platinum is produced each year.

After finding an economic PGE deposit, the second major challenge lies in developing it. PGE deposits are often buried deep underneath hundreds of meters of overburden, requiring years of development and massive capital investment to access. Ivanhoe’s Platreef mine for instance has been in development for decades, with a Capex cost for Phase I in the many hundreds of millions of dollars. Infrastructure and stable electricity supply in South Africa present further challenges. All of which contribute structural limitations to how much new PGE supply can be brought on and on what timeframe.

Source: https://natural-resources.canada.ca/minerals-mining/mining-data-statistics-analysis/minerals-metals-facts/platinum-facts

Figure 2 :Source: https://natural-resources.canada.ca/minerals-mining/mining-data-statistics-analysis/minerals-metals-facts/platinum-facts

ValOre’s Pedra Branca PGE project in Brazil:

Among the limited number of PGE projects under development globally, ValOre’s Pedra Branca project in Brazil offers a number of significant advantages:

The first is location. Brazil, where mining is one of the pillars of the economy, has made a priority of streamlining the licencing and permitting process11, and our location in Brazil’s Ceará State has excellent access to transport and electrical infrastructure.

Secondly, unlike the majority of PGE deposits around the world, the mineral resource at ValOre’s Pedra Branca deposit is near-surface, minimising the amount of development capital required to access the deposit and allowing low-cost open-cast mining to be the preferred method of extraction.

Our final advantage lies in our capable and committed team, with a depth of experience covering exploration and discovery, financing and corporate development, community engagement, permitting and major capital project delivery – all 100% focused on delivering this world-class project.

Company Location Mineral Resource / Mineral Reserve PGE Grades Project Stage Market Capitalization (CAD M)
Platinum Group Metals Ltd.
(TSX: PTM)
Waterberg Project (JV)
South Africa
23.4 Moz 4E
(Proven & Probable Reserves)
2.96 g/t 4E Definitive Feasibility Study (2024) $454M
Bravo Mining Corp.
(TSXV: BRVO)
Luanga Project
Pará, Brazil
10.4 Moz PdEq12
(Measured & Indicated Resource)
5.0 Moz PdEq (Inferred Resource)
2.01 – 2.04 g/t
PdEq
Preliminary Economic Assessment (2025) $550M
ValOre Metals Corp.
(TSXV: VO)
Pedra Branca Project
Ceará, Brazil
2.2 Moz 2PGE+Au[13]
(Inferred Resource)
1.08 g/t
2PGE+Au
Mineral Resource
Estimate Update (2022)
$29M
Generation Mining Ltd.
(TSX: GENM)
Marathon Project
Ontario, Canada
2.6 Moz Pd + 0.8 Moz Pt
(Proven & Probable Reserves)
0.64 g/t Pd
0.20 g/t Pt
Feasibility Study (2025) $245M
Stillwater Critical Minerals Corp.
(TSXV: PGE)
Stillwater West Project
 Montana, USA
2.0 Moz Pd + 1.3 Moz Pt
(Inferred Resource)
0.25 g/t Pd
0.15 g/t Pt
Mineral Resource Estimate (2023) $126M

Figure 3: Comparison of Junior development-stage PGE projects. The comparable companies listed are included for information and comparison purposes only.

Sources – All information presented in this table has been derived exclusively from publicly available NI 43-101 technical reports and associated issuer disclosures for the referenced projects. Readers are cautioned to refer to and rely upon each project’s respective technical report for full details, assumptions, and qualifications:  Waterberg Project; Luanga Project; Pedra Branca Project; Marathon Project; Stillwater West Project.

The path forward for 2026:

My priority since joining ValOre has been clear: sharpen our strategic direction, put us on a clear and sustainable path to development for the Pedra Branca PGE project, and position the company to unlock the full potential of our portfolio. We are fortunate to hold assets that align with a growing global demand for critical and precious metals, and I firmly believe 2026 will be a pivotal year in proving their value.

As we move into 2026, you can expect continued transparency, regular updates on our progress, and a commitment to responsible, technically sound, and value-focused work. Our team is energized, our vision is clear, and the path ahead is one of execution and seizing opportunity.

I would encourage everyone to engage with us through the contacts on our website, join our email news list and new for this year, sign up to meet us in a series of in-person presentations (details to follow in the new year).

On behalf of the ValOre board and management team, I wish you and your families a healthy, peaceful, and prosperous New Year. Thank you for being part of ValOre’s journey. The best is yet to come.

Warm regards,

Nick Smart
Chief Executive Officer
ValOre Metals Corp.

Qualified Person (“QP”)

The technical information in this news release has been prepared in accordance with Canadian regulatory requirements set out in NI 43-101 and reviewed and approved by Thiago Diniz, P.Geo., ValOre’s Qualified Person  and Vice President of Exploration.

About ValOre Metals Corp.

ValOre Metals Corp. ((TSX-V: VO, OTCQB: KVLQF, Frankfurt: KEQ0) is a Canadian company with a team aiming to deploy capital and knowledge on projects which benefit from substantial prior investment by previous owners, existence of high-value mineralization on a large scale, and the possibility of adding tangible value through exploration and innovation.

For further information about ValOre Metals Corp., or this news release, please visit our website at www.valoremetals.com or contact Investor Relations at 778-819-4484, or by email at [email protected].

ValOre Metals Corp. is a proud member of Discovery Group. For more information please visit: http://www.discoverygroup.ca/

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This news release contains “forward-looking statements” within the meaning of applicable securities laws. Although ValOre believes that the expectations reflected in its forward-looking statements are reasonable, such statements have been based on factors and assumptions concerning future events that may prove to be inaccurate. These factors and assumptions are based upon currently available information to ValOre. Such statements are subject to known and unknown risks, uncertainties and other factors that could influence actual results or events and cause actual results or events to differ materially from those stated, anticipated or implied in the forward-looking statements. A number of important factors including those set forth in other public filings could cause actual outcomes and results to differ materially from those expressed in these forward-looking statements. Factors that could cause the actual results to differ materially from those in forward-looking statements include the future operations of ValOre and economic factors. Readers are cautioned to not place undue reliance on forward-looking statements. The statements in this press release are made as of the date of this release and, except as required by applicable law, ValOre does not undertake any obligation to publicly update or to revise any of the included forward-looking statements, whether as a result of new information, future events or otherwise. ValOre undertakes no obligation to comment on analyses, expectations or statements made by third parties in respect of ValOre, or its financial or operating results or (as applicable), their securities.


1 World Platinum Investment Council
2 Platinum for Palladium Substitution in 2023
3 Electric Vehicle Outlook 2025
4 Ford retreats from EVs and takes big financial hit as Trump policies grip industry
5 Japan's Honda to scale back on electric vehicles, focus on hybrids
6 Porsche and VW dial back EV ambitions as market shifts and costs mount
7 Platinum’s discount to gold is driving a return to platinum jewellery demand growth
8 2024 – World Gold Council Data
9 Platinum Futures Near Record High
10 Platinum Futures Near Record High
11 Regulators align efforts to speed up mining permitting in Brazil
12 PdEq: Palladium equivalent grade or ounces calculated using issuer-specific assumptions disclosed in the relevant technical reports.
13 Independent Technical Report – Mineral Resource Update on the Pedra Branca PGE Project, Ceará State, Brazil (Effective date: March 8, 2022)

Vancouver, British Columbia, July 2, 2025 – ValOre Metals Corp. (“ValOre”; TSX-V: VO, OTCQB: KVLQF, Frankfurt: KEQ0; “the Company”) today provided an update on recent exploration activities at its 100%-owned Pedra Branca Platinum Group Elements (“PGE”, “2PGE+Au”) Project (“Pedra Branca”) in northeastern Brazil, and reinforced its focus on advancing the Company’s broader strategic growth initiatives in Brazil.

Jim Paterson, ValOre’s Chairman and CEO stated: “We continue to pursue acquisitions of high-quality gold exploration and development projects in Brazil. At the same time, the development of our flagship Pedra Branca platinum and palladium (“PGE”) project remains a top priority, as demonstrated by the multiple high-grade platinum and palladium assays released today from the 87 hole Trado® auger drilling program recently completed at the Esbarro deposit. Trado® hole AD25ES99 delivered a standout assay result of 10.0 m, starting from surface, grading 12.95 g/t 2PGE+Au, including 4.0 m grading 29.57 g/t 2PGE+Au starting from 1.0 m.”

Pedra Branca PGE Project – Exploration Highlights

Trado® Auger Drilling – Esbarro Deposit

  • 87 hole drill program was completed to collect additional weathered material for ongoing metallurgical test work, improve grade control and enhance geological understanding of the deposit;
  • Assay results confirm continuity of high-grade PGE mineralization starting from surface to depths reaching 20 metres (maximum vertical reach of the auger drill), extending over 1 kilometre along strike, with widths up to 300 metres;
  • PGE assay results from 613 Trado® auger samples are disclosed in full in this release.

Regulatory Advancements

  • Brazil’s National Mining Agency (Agencia Nacional de Mineração, “ANM”) has formally approved the Final Exploration Reports for key mineral claims within the Pedra Branca PGM Project, including those claims hosting the Esbarro, Cedro, Curiu, and Cana Brava deposits;
  • With ANM’s approval, these claims have entered the Mining Concession application phase, marking a major advancement in regulatory status and development readiness.

Metallurgy/Engineering

  • Metallurgical testwork is underway in collaboration with the University of Cape Town, evaluating both conventional flotation and leaching processing routes to optimize PGE recoveries from weathered, fresh and chromitite rock domains. Initial preliminary results expected by the end of July;
  • Preliminary water supply studies are scheduled to commence in H2 2025, as part of preparation for a future Preliminary Economic Assessment (PEA).

Thiago Diniz, ValOre’s VP of Exploration commented: “The results from this Trado® auger drilling infill campaign have enhanced grade control and confirmed consistent, near-surface high-grade PGE mineralization over more than a kilometre and will be key for future modeling and updated resource estimates. Additionally, positive assays from Esbarro East extend mineralization beyond current resource boundaries and highlight an opportunity to add shallow ounces and grow the overall resource base at Esbarro. With key regulatory milestones achieved and metallurgical results expected soon, the team remains focused on advancing the Pedra Branca PGE Project toward development.”

Trado® Auger Drilling – Esbarro Deposit

ValOre’s technical team recently completed a targeted Trado® auger drilling program at the Esbarro deposit, with 87 holes drilled and over 560 metres of ultramafic, PGE-bearing rock intercepted. Of the 87 holes, 74 returned PGE mineralization, including 28 with grade-thickness values exceeding 10 gram-metres (grade x interval). The primary objective of the program was to generate additional weathered material for ongoing metallurgical testwork, while also providing a valuable opportunity to refine grade control and enhance geological interpretation of the deposit’s near-surface horizons. Highlight results include:

  • 10.0 metres (“m”) grading 12.95 grams per tonne palladium + platinum + gold (“g/t 2PGE+Au”) from surface, including 4.0 m grading 29.57 g/t 2PGE+Au from 1.0 m – Trado® hole AD25ES99;
  • 10.0 m at 1.94 g/t 2PGE+Au from surface, including 5.0 m grading 2.95 g/t 2PGE+Au from 5.0 m – Trado® hole AD25ES101;
  • 9.0 m at 2.13 g/t 2PGE+Au from surface, including 3.0 m grading 5.95 g/t 2PGE+Au from 6 m – Trado® hole AD25ES63;
  • 8.0 m at 2.72 g/t 2PGE+Au from surface – Trado® hole AD25ES77;
  • 5.0 m at 3.78 g/t 2PGE+Au from surface, including 3.0 m grading 5.51 g/t 2PGE+Au from 0 m – Trado® hole AD25ES73.

In addition, drilling at the Esbarro East Zone, located within the 2022 NI 43-101 Inferred Resource* area, has extended mineralization beyond current pit-constrained limits, adding further value to the high-grade near-surface intercepts defined in the main Esbarro zone. Recent drilling has outlined high-grade PGE mineralization at surface for over 400 metres along strike. Highlight results include:

  • 9.5 m at 5.62 g/t 2PGE+Au from surface, including 2.0 m grading 18.41 g/t 2PGE+Au from 2.0 m – Trado® hole AD25ES39;
  • 8.5 m at 2.42 g/t 2PGE+Au from surface, including 4.0 m grading 4.55 g/t 2PGE+Au from 0 m – Trado® hole AD24ES23;
  • 9.5 m at 1.97 g/t 2PGE+Au from surface, including 2.0 m grading 4.09 g/t 2PGE+Au from 4.0 m – Trado® hole AD24ES32;
  • 20.0 m at 0.94 g/t 2PGE+Au from surface – Trado® hole AD25ES30.

Prior to the Trado® drilling at Esbarro East, a total of 233 soil samples were collected over a strike length of more than 800 metres, delineating the continuity of mineralization from the main Esbarro deposit. Assay highlights include soil values of up to 3,000 ppb 2PGE+Au.

CLICK HERE for Table 1, which shows Trado® auger assay results for all mineralized Trado® holes drilled at Esbarro’s Main (“Esbarro”) and East (“Esbarro East”) zones.

Location map of the Esbarro Deposit - Main and East Zones

Figure 1: Location map of the Esbarro Deposit – Main and East Zones

Regulatory Advancements – Core Deposits Enter Mining Concession Phase

Brazil’s National Mining Agency (Agencia Nacional de Mineração, “ANM”) has formally approved the Final Exploration Reports for key mineral claims within the Pedra Branca Project, including the tenements that host the four core deposits: Esbarro, Cedro, Curiu, and Cana Brava, which together account for approximately 1 million ounces (“Moz) of the total 2.2 Moz 2PGE+Au outlined in the 2022 NI 43-101 Inferred Resource Estimate*.

The approved claims have now progressed into the Mining Concession application phase, representing a key step forward in advancing Pedra Branca along the regulatory pathway toward potential development.

This milestone enables the Company to intensify technical de-risking and project development work on these deposits, including ongoing metallurgical testwork and preliminary engineering studies addressing water supply, in preparation for a Preliminary Economic Assessment (PEA).

Location map of the mineral claims that have had their Final Exploration Reports approved by ANM.

Figure 2: Location map of the mineral claims that have had their Final Exploration Reports approved by ANM.

Trado® Auger Drilling QA/QC Procedures

As part of ValOre’s Quality Assurance and Quality Control (QA/QC) protocol for Trado® auger drilling programs, a total of three quality control sample types were included in each analytical batch, which consists of 40 to 60 Trado® samples plus one certified standard, one coarse blank and one pulp duplicate sample resulting in a QA/QC insertion rate of 5 to 7.5%. Control samples were inserted in a logical sequence, defined by the geologist based on detailed logging of Trado® chips.

Trado® samples are collected at one-metre intervals. The number of auger runs required to complete each metre depends on the nature of the rock being drilled. Material from each run is deposited directly into a clean plastic tray and a representative chip sample is selected and stored in a plastic chip case for geological logging and future reference.

Once a full metre is completed, the total recovered material (approximately 15 kg, with 90-100% recovery) is homogenized using a plastic tarp and subsequently quartered. A representative sample of approximately 2 kg is then collected and identified for geochemical analysis. The remaining material is labeled by metre and stored at ValOre’s core shack for future analyses. For every metre, the plastic tray is cleaned, and a new plastic tarp is used to ensure sample integrity during homogenization and quartering.

All samples are sent to SGS Laboratory and assayed by Fire Assay for Pd, Pt, Au and by ICP for multielement analysis. Upon receipt of assay results, data are systematically reviewed, and QA/QC control charts are generated and evaluated.

Qualified Person (“QP”)

The technical information in this news release has been prepared in accordance with Canadian regulatory requirements set out in NI 43-101 and reviewed and approved by Thiago Diniz, P.Geo., ValOre’s QP and Vice President of Exploration.

About ValOre Metals Corp.

ValOre Metals Corp. ((TSX-V: VO, OTCQB: KVLQF, Frankfurt: KEQ0) is a Canadian company with a team aiming to deploy capital and knowledge on projects which benefit from substantial prior investment by previous owners, existence of high-value mineralization on a large scale, and the possibility of adding tangible value through exploration and innovation.

ValOre’s Pedra Branca Platinum Group Elements Project comprises 45 exploration licenses covering a total area of 51,096 hectares (126,260 acres) in northeastern Brazil. At Pedra Branca, 7 distinct PGE+Au deposit areas host, in aggregate, a 2022 NI 43-101 inferred resource of 2.198 Moz 2PGE+Au contained in 63.6 Mt grading 1.08 g/t 2PGE+Au. ValOre’s team believes the Pedra Branca project has significant exploration discovery and resource expansion potential. (CLICK HERE to download 2022 technical report* and CLICK HERE for news release dated March 24, 2022).

*The 2022 Technical Report is entitled “Independent Technical Report –Mineral Resource Update on the Pedra Branca PGE Project, Ceará State, Brazil” was prepared as a National Instrument 43-101 Technical Report on behalf of ValOre Metals Corp. with an effective date of March 08, 2022. The 2022 Technical Report by Independent qualified persons, Fábio Valério (P.Geo.) and Porfirio Cabaleiro (P.Eng.), of GE21, commissioned to complete the mineral resource estimate while Chris Kaye of Mine and Quarry Engineering Services Inc. (MQes), was commissioned to review the metallurgical information. The Mineral Resource estimates were prepared in accordance with the CIM Standards, and the CIM Guidelines, using geostatistical, plus economic and mining parameters appropriate to the deposit. Mineral Resources, which are not mineral reserves, do not have demonstrated economic viability, and may be materially affected by environmental, permitting, legal, marketing, and other relevant issues. Mineral Resources are based upon a cut-off grade of 0.4 g/t PGE+Au, correlated to Pd_eq grade of 0.35 g/t, and were limited by an economic pit built in Geovia Whittle 4.3 software and following the geometric and economic parameters as disclosed in the 2022 NI 43-101 Technical Report,

On behalf of the Board of Directors,

“Jim Paterson”

James R. Paterson, Chairman and CEO

ValOre Metals Corp.

For further information about ValOre Metals Corp., or this news release, please visit our website at www.valoremetals.com or contact Investor Relations at 778-819-4484, or by email at [email protected].

ValOre Metals Corp. is a proud member of Discovery Group. For more information please visit: http://www.discoverygroup.ca/

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This news release contains “forward-looking statements” within the meaning of applicable securities laws. Although ValOre believes that the expectations reflected in its forward-looking statements are reasonable, such statements have been based on factors and assumptions concerning future events that may prove to be inaccurate. These factors and assumptions are based upon currently available information to ValOre. Such statements are subject to known and unknown risks, uncertainties and other factors that could influence actual results or events and cause actual results or events to differ materially from those stated, anticipated or implied in the forward-looking statements. A number of important factors including those set forth in other public filings could cause actual outcomes and results to differ materially from those expressed in these forward-looking statements. Factors that could cause the actual results to differ materially from those in forward-looking statements include the future operations of ValOre and economic factors. Readers are cautioned to not place undue reliance on forward-looking statements. The statements in this press release are made as of the date of this release and, except as required by applicable law, ValOre does not undertake any obligation to publicly update or to revise any of the included forward-looking statements, whether as a result of new information, future events or otherwise. ValOre undertakes no obligation to comment on analyses, expectations or statements made by third parties in respect of ValOre, or its financial or operating results or (as applicable), their securities.